Trail Work  
This is a panorama photo of a driveway that had been installed at the AT crossing of Lake Buel Rd.  the owners cut the driveway thru an easement purchased by the NPS to widen the trail corridor.  The owners have since moved the driveway (see next photo) but the case for damages is still pending.  This encroachement was first detected and reported by the volunteer Corridor Monitor.

This is a panorama photo of a driveway that had been installed at the AT crossing of Lake Buel Rd. the owners cut the driveway thru an easement purchased by the NPS to widen the trail corridor. The owners have since moved the driveway (see next photo) but the case for damages is still pending. This encroachement was first detected and reported by the volunteer Corridor Monitor.


Powered by Gallery v1 RSS